Project - Kirimoko Subdivision, WanakaClient - Crescent Investments LtdEngineerName - Vergne WilsonCompany - Southern Land CLKPhone: 03 443 5577Involvement
- Earthworks: 7100 m3 of earthworks including strip and stockpile topsoil, cut to waste material, cut to fill, topsoiling and grassing.
- Roading: Over 3,600 m2 of full pavement construction with basalt rock channels
- Sewer: Installation of over 470m of sewer pipes and manholes.
- Stormwater: Intricate network of raingardens to collect and filter stormwater on site. Pipelines ranging from 750mm dia through to 225mm dia.
- Water: Installation of over 600m of water pipe on site.
-
Project - Hidden Hills Subdivision , WanakaClient - Allenby Farms LtdEngineerName - Robyn PatersonCompany - Paterson Pitts Partners LtdPhone: 03 443 0110Involvement
- Earthworks: 34,000m3 of earthworks including strip and stockpile topsoil, cut to fill, topsoiling and grassing.
- Roading: Over 10,000 m2 of full pavement construction and the Intersection upgrade of Pisa Moorings Rd and State Highway 6.
- Sewer: Installation of over 2800m of sewer network.
- Stormwater: Installation of over 1300m of Stormwater pipe.
- Water: Installation of over 2400m of water pipe and water pressure booster station.
-
Project - Beach Grove Subdivision, Stage 1, Kaiapoi, CanterburyClient - Beach Road Estates LtdEngineer Name - Mark CochranCompany - Woods Consultants, ChristchurchPhone: 027 490 8485Involvement
- Landscaping: 28,000 m2 of topsoiling and grassing.
- Roading:Over 2400 m of kerbing, 9000 m2 of full pavement construction and asphalt surfacing.
- Sewer: Installation of 94 ECCO tanks over 3300 m of sewer network.
- Stormwater: Installation of 2000 m of Stormwater pipe.
- Water: Installation of over 3000 m of water pipe.
-
Project - Aspiring Lifestyle Retirement Village , Stages 1 to 9, WanakaClient - ALRV LtdEngineer Name - Robyn PatersonCompany - Paterson Pitts Partners LtdPhone: 03 443 0110Involvement
- Completed 9 stages of this Retirement Village.
- The work has been made more challenging having to work in very close proximity to the builders.
- As the stages progressed we were working immediately adjacent to houses and units with residents of the village already living in them.
- Our management and operation plan ensured we minimised dust, noise and vibration.
Earthworks - 94,000 m3 of earthworks including strip and stockpile topsoil, cut to fill.Roading - Over 18,000 m2 of full pavement construction, 5,500m of kerbing and 13,000 m2 of surfacing.Sewer - Installation of over 2700 m of sewer network.Stormwater - Installation of over 2000 m of Stormwater pipe.Water - Installation of over 3000 m of water pipe. -
Allenby Farms Subdivision Development
Project - Roading Subdivision Development
Client - Allenby Farms Ltd
Consultant / Engineer - Milward Finlay Lobb Ltd and Paterson Pitts Partners, Cromwell
Involvement - Benchmark Construction has completed 13 separate land development contracts for this client totalling 387 lots.
For Hidden Hills, Benchmark Construction was the Main Contractor, completing;- Earthworks: 34,000m3 of earthworks including strip and stockpile topsoil, cut to fill, topsoiling and grassing.
- Roading: Over 10,000 m2 of full pavement construction and the Intersection upgrade of Pisa Moorings Rd and State Highway 6.
- Sewer: Installation of over 2800m of sewer network.
- Stormwater: Installation of over 1300m of Stormwater pipe.
- Water: Installation of over 2400m of water pipe and water pressure booster station.
-
Perriam Cove - Cromwell - Subdivision Development
Project - 67 lot Subdivision Development with Inland Marina
Client - Pisa Cove Ltd
Consultants / Engineer - Paterson Pitts Partners, Cromwell
Involvement - Benchmark Construction was the Main Contractor, completing;- Earthworks: 121,000m3 of earthworks including strip and stockpile topsoil, cut to waste material, cut to fill, excavation of marina, topsoiling and grassing.
- Roading: Over 10,000 m2 of full pavement construction and the Intersection upgrade of Pisa Moorings Rd and State Highway 6.
- Sewer: Installation of over 2400m of sewer network including two sewer pump stations.
- Stormwater: Installation of over 2200m of Stormwater pipe.
- Water: Installation of over 2450m of water pipe on site and 3250m of 250 ID water mains to site from the existing town supply.
-
Project - Soho St, Cardrona Valley Subdivision , WanakaClient - Brooklynne Holdings LtdEngineerName - Michael LeeCompany - Airey Consultants LtdPhone: 09 486 4542Involvement
11 Lot Subdivision in the Cardona Valley- Earthworks: 1,500 m3 of earthworks including strip and stockpile topsoil, cut to fill, topsoiling and grassing.
- Roading: Over 1,900 m2 of full pavement construction, kerbing, footpaths, rock walls, surfacing.
- Sewer: Installation of over 500m of sewer network.
- Services: Installation of over 400m of water pipe, telecom and power.
-
Project - West Meadows Stages 1 and 2 Subdivision , WanakaClient - Willowridge Developments LtdEngineerName - Steve DickieCompany - Paterson Pitts PartnersPhone: 03 443 0110Involvement
- Roading: Over 7,400 m2 of full pavement construction and surfacing
- Footpaths: Over 2,000 m2 of footpath construction and surfacing
- Sewer: Installation of over 1,9000m of sewer pipes and manholes.
- Stormwater: 1500m of stormwater lines, mudtanks and manholes.
- Water: Installation of over 2,100m of water pipe on site.
-
Project - Cleddau River Flood ProtectionClient - Downer EDI New ZealandEngineer Name - Mark AdamsonCompany - Downer EDIPhone: 027 433 0116Involvement
- Siteworks, stormwater and foul sewer pipe systems as part of project to elevate the staff housing at Milford Sound out of the flood zone.
- 460m of concrete SW lines
- Over 770 m of new foul sewer pipes up to 3.5 m depth, including pipe crossing over estuary.
- New Foul Sewer Pumping station and holding tanks.
- Water, telecom, power and gas liner installations.
- Electrical cabinetry, transformer, switchboards.
- Magnetic flow meters, Telemetry.
- Commission and test new station.
-
QLDC Broadview Rise Booster Pump Station. Contract CT10-011, Queenstown
Project - This contract was a Lump Sum Design Build for a new building housing three water booster pumps, new electrical cabinet, emergency standby generator, telemetry and scada.
Client - Queenstown Lakes District Council
Consultants / Engineer - Queenstown Lakes District CouncilPump Stations
- Grundfos Pumps
- We were required to install two duty booster pumps and a fire fighting booster pump in a new shed.
- New Switchboard and telemetry.
- The work involved a period of shut down for the new pipework to be connected up to the existing watermains.
Rising Mains
- New 150mm dia suction and discharge pipework from booster pumps out of shed wall and connected to existing rising main.
Drainage
- Trench excavation to install all new pipework to cut out and tap into existing mains
- Sump in floor of shed and connected to street.
- Earthworks
- Earthworks to construct new building foundations.
- Footpath and road reinstatement
- Landscaping around building
-
Upper Ardmore St Improvements
Project - Ardmore Roundabout and Upper Ardmore St Improvements, Wanaka
Client - Queenstown Lakes District Council
Consultants / Engineer - Name:Grant Kluyts, Company:MWH, Phone:03 450 0890Involvement
New roundabout and Ardmore St business district upgrade.- Replace existing watermains.
- Buildout islands for parking separation with irrigation and lighting.
- New Roundabout
- Footpaths, handrails , road street furniture.
- Landscaping
-
Project - Outlet Camp – PE pumping main with a Wastewater Wet WellClient - Callum UrquhartEngineerName - Peter JoyceCompany - Paterson Pitts Partners LtdPhone: 03 443 0110Activities
- Sewer
- 2200 meter 100 mm dia PE rising and falling main, connecting a new WWTP at the camp ground up to the QLDC gravity main on Aubrey Road.
-
Project - Hawea Waste Water Treatment PlantClient - Queenstown Lakes District CouncilEngineerName - Helen WightmanCompany - CPG New ZealandPhone: 03 477 7133Involvement
- Design and Build system for the extractions and treatment of waste water from the storage ponds.
- Construct a new building structure.
- Intake structure, pumps and pipework.
- Electrical cabinetry, transformer, switchboards.
- Flow meters, Telemetry.
- Irrigation system in adjoining land to provide irrigation for animal feed crop.
- Commission and test new station.
-
Project - Hawea Bores Water Treatment StationClient - Queenstown Lakes District CouncilEngineerName - Grant KluytsCompany - MWHPhone: 03 450 0890Involvement
- Clear site and complete earthworks for new building.
- Construct a new building structure.
- Install new pumps into bore wells and link bores to treatment plant with PE pipe
- Air valves and surge protection valves.
- Install UV treatment and chlorine dosing equipment.
- Electrical cabinetry, transformer, switchboards.
- Magnetic flow meters, Telemetry.
- Commission and test new station.
-
Project - Frankton Road Water Pump StationClient - Queenstown Lakes District CouncilEngineerName - Grant KluytsCompany - MWHPhone: 03 450 0890Involvement
- Clear site and complete earthworks.
- Construct a new building structure.
- Install 4 Grundfos CR150-5-2 pumps, stainless steel manifolds, 400 dia PE pipework, pressure test.
- Connect to QLDC rising mains to water reservoir, new pumping main to Frankton, valves, anchor blocks.
- Electrical cabinetry, transformer and switchboards.
- VSD's 4 x 55kw Danfoss drives, Magnetic flow meters, Swampfox RTU.
- Divert existing 750mm dia stormwater at over 3m depth around site.
- Pavement construction
- Commission and test new station, trail running for 1 month.
- Demolish old pump station
-
Project - Dunstan Hospital Waste Water Treatment PlantClient - Southern District Health BoardEngineerName - David HughesCompany - Opus ConsultantsPhone: 03 471 5500Involvement
- Construct new system for the treatment of waste water from the hospital.
- Install new underground tanks.
- Pipework from hospital to tanks.
- Electrical cabinetry, switchboards.
- Flow meters, Telemetry.
- Trickle system pipework to allow treated waste water into ground.
- Commission and test new station.
- Remove old treatment facility.
-
Project - Broadview Rise Water Booster StationClient - Queenstown Lakes District CouncilEngineerName - Grant KluytsCompany - MWHPhonn: 03 450 0890Involvement
- Clear site and complete earthworks.
- Construct a new building structure.
- Install 3 Grundfos pumps, stainless steel manifolds.
- Connect to QLDC rising mains, valves, anchor blocks.
- Electrical cabinetry, transformer, switchboards and generator.
- Magnetic flow meters, Telemetry.
- Commission and test new station.
-
Outlet Camp Foul Sewer
Project - New Sewer Pump Station, holding tanks and pumping main
Client - Outlet Motor Camp
Consultants / Engineer - Paterson Pitts Partners, Cromwell
Involvement - Benchmark Construction was the Main Contractor, completing;- Installation of over 2200m of sewer rising pumping main.
- Wet well Pump station, Containment tank, scour and air valves, electrical switch board
-
Project - Blenhiem St Housing New Zealand, ChristchurchClient - Dax GroupEngineerName - Brad McLeayCompany - Dax GroupPhone: 03 326 4055Involvement
- New building for Housing New Zealand.
- Siteworks.
- On site stormwater disposal tanks.
- All services to buildings, water foul sewer, water and connect all to CCC services.
- Pavement construction and asphalt paving.
- Landscaping.
-
Project - New World Carpark, AlexandraClient - Breen ConstructionEngineerName - Craig RossCompany - Breen ConstructionPhone: 03 440 0190Involvement
- Remove existing carpark and construct new carpark.
- Mudtanks.
- New kerbing.
- Traffic Control and diversions.
- Pavement construction and asphalt paving.
- Landscaping.
-
McArthur Gardens
Project - Upgrade to paving in CODC park
Client - Central Otago District Council
Consultant / Engineer - Central Otago District Council
Involvement - Benchmark Construction was the Main Contractor, completing;Removal of existing asphalt paths, paving stones and irrigation. Install root guard to all gardens. Excavate and construct new asphalt footpaths and paving stones.