Projects
Servicing all of Central Otago, Queenstown Lakes, Southland, Otago and Canterbury.

  • Kirimoko Subdivision
    Project - Kirimoko Subdivision, Wanaka
     
    Client - Crescent Investments Ltd
     
    EngineerName - Vergne Wilson 
    Company - Southern Land CLK
    Phone: 03 443 5577
     
    Involvement
    • Earthworks: 7100 m3 of earthworks including strip and stockpile topsoil, cut to waste material, cut to fill, topsoiling and grassing. 
    • Roading: Over 3,600 m2 of full pavement construction with basalt rock channels 
    • Sewer: Installation of over 470m of sewer pipes and manholes. 
    • Stormwater: Intricate network of raingardens to collect and filter stormwater on site.  Pipelines ranging from 750mm dia through to 225mm dia.
    • Water: Installation of over 600m of water pipe on site. 
     
  • Hidden Hills Subdivision
    Project - Hidden Hills Subdivision , Wanaka
     
    Client - Allenby Farms Ltd
     
    EngineerName - Robyn Paterson
    Company - Paterson Pitts Partners Ltd
    Phone: 03 443 0110
     
    Involvement
    • Earthworks: 34,000m3 of earthworks including strip and stockpile topsoil, cut to fill, topsoiling and grassing. 
    • Roading: Over 10,000 m2 of full pavement construction and the Intersection upgrade of Pisa Moorings Rd and State Highway 6. 
    • Sewer: Installation of over 2800m of sewer network. 
    • Stormwater: Installation of over 1300m of Stormwater pipe.
    • Water: Installation of over 2400m of water pipe and water pressure booster station.  
     
  •  Beach Grove Subdivision
    Project - Beach Grove Subdivision, Stage 1, Kaiapoi, Canterbury
     
    Client - Beach Road Estates Ltd
     
    Engineer Name - Mark Cochran
    Company - Woods Consultants, Christchurch
    Phone: 027 490 8485
     
    Involvement
     
    • Landscaping: 28,000 m2 of topsoiling and grassing. 
    • Roading:Over 2400 m of kerbing, 9000 m2 of full pavement construction and asphalt surfacing. 
    • Sewer: Installation of 94 ECCO tanks over 3300 m of sewer network. 
    • Stormwater: Installation of 2000 m of Stormwater pipe.
    • Water: Installation of over 3000 m of water pipe. 
     
  • Aspiring Lifestyle Retirement Village
    Project - Aspiring Lifestyle Retirement Village , Stages 1 to 9, Wanaka
     
    Client - ALRV Ltd
     
    Engineer Name - Robyn Paterson
    Company - Paterson Pitts Partners Ltd
    Phone: 03 443 0110
     
    Involvement
    • Completed 9 stages of this Retirement Village. 
    • The work has been made more challenging having to work in very close proximity to the builders.  
    • As the stages progressed we were working immediately adjacent to houses and units with residents of the village already living in them.
    • Our management and operation plan ensured we minimised dust, noise and vibration.
     
    Earthworks - 94,000 m3 of earthworks including strip and stockpile topsoil, cut to fill. 
    Roading - Over 18,000 m2 of full pavement construction, 5,500m of kerbing and 13,000 m2 of surfacing. 
    Sewer - Installation of over 2700 m of sewer network. 
    Stormwater - Installation of over 2000 m of Stormwater pipe.
    Water - Installation of over 3000 m of water pipe.  
     
  • Allenby Farms

    Allenby Farms Subdivision Development

    Project - Roading Subdivision Development

    Client - Allenby Farms Ltd

    Consultant / Engineer - Milward Finlay Lobb Ltd and Paterson Pitts Partners, Cromwell

    Involvement - Benchmark Construction has completed 13 separate land development contracts for this client totalling 387 lots.

    For Hidden Hills, Benchmark Construction was the Main Contractor, completing;

    • Earthworks: 34,000m3 of earthworks including strip and stockpile topsoil, cut to fill, topsoiling and grassing.
    • Roading: Over 10,000 m2 of full pavement construction and the Intersection upgrade of Pisa Moorings Rd and State Highway 6.
    • Sewer: Installation of over 2800m of sewer network.
    • Stormwater: Installation of over 1300m of Stormwater pipe.
    • Water: Installation of over 2400m of water pipe and water pressure booster station.
  • Perriam Cove

    Perriam Cove - Cromwell - Subdivision Development

    Project - 67 lot Subdivision Development with Inland Marina
    Client - Pisa Cove Ltd
    Consultants / Engineer - Paterson Pitts Partners, Cromwell
    Involvement - Benchmark Construction was the Main Contractor, completing;

    • Earthworks: 121,000m3 of earthworks including strip and stockpile topsoil, cut to waste material, cut to fill, excavation of marina, topsoiling and grassing.
    • Roading: Over 10,000 m2 of full pavement construction and the Intersection upgrade of Pisa Moorings Rd and State Highway 6.
    • Sewer: Installation of over 2400m of sewer network including two sewer pump stations.
    • Stormwater: Installation of over 2200m of Stormwater pipe.
    • Water: Installation of over 2450m of water pipe on site and 3250m of 250 ID water mains to site from the existing town supply.
  • Cardona Valley
    Project - Soho St, Cardrona Valley Subdivision , Wanaka
     
    Client - Brooklynne Holdings Ltd
     
    EngineerName - Michael Lee 
    Company - Airey Consultants Ltd
    Phone: 09 486 4542
     
    Involvement
    11 Lot Subdivision in the Cardona Valley
    • Earthworks: 1,500 m3 of earthworks including strip and stockpile topsoil, cut to fill, topsoiling and grassing. 
    • Roading: Over 1,900 m2 of full pavement construction, kerbing, footpaths, rock walls, surfacing.  
    • Sewer:  Installation of over 500m of sewer network.  
    • Services: Installation of over 400m of water pipe, telecom and power.
  • West Meadows
    Project - West Meadows Stages 1 and 2 Subdivision , Wanaka
     
    Client - Willowridge Developments Ltd
     
    EngineerName - Steve Dickie 
    Company - Paterson Pitts Partners
    Phone: 03 443 0110
     
    Involvement
    • Roading: Over 7,400 m2 of full pavement construction and surfacing
    • Footpaths: Over 2,000 m2 of footpath construction and surfacing
    • Sewer: Installation of over 1,9000m of sewer pipes and manholes.
    • Stormwater: 1500m of stormwater lines, mudtanks and manholes.
    • Water: Installation of over 2,100m of water pipe on site.

  •  Cleddau River Flood Protection
    Project - Cleddau River Flood Protection
     
    Client - Downer EDI New Zealand
     
    Engineer Name - Mark Adamson
    Company - Downer EDI
    Phone: 027 433 0116
     
    Involvement
    • Siteworks, stormwater and foul sewer pipe systems as part of project to elevate the staff housing at Milford Sound out of the flood zone.
    • 460m of concrete SW lines
    • Over 770 m of new foul sewer pipes up to 3.5 m depth, including pipe crossing over estuary.
    • New Foul Sewer Pumping station and holding tanks. 
    • Water, telecom, power and gas liner installations.
    • Electrical cabinetry, transformer, switchboards.  
    • Magnetic flow meters, Telemetry.
    • Commission and test new station. 
  •  Broadview Rise Booster Pump Station

    QLDC Broadview Rise Booster Pump Station. Contract CT10-011, Queenstown

    Project - This contract was a Lump Sum Design Build for a new building housing three water booster pumps, new electrical cabinet, emergency standby generator, telemetry and scada.
    Client - Queenstown Lakes District Council
    Consultants / Engineer - Queenstown Lakes District Council

    Pump Stations

    • Grundfos Pumps
    • We were required to install two duty booster pumps and a fire fighting booster pump in a new shed.
    • New Switchboard and telemetry.
    • The work involved a period of shut down for the new pipework to be connected up to the existing watermains.

    Rising Mains

    • New 150mm dia suction and discharge pipework from booster pumps out of shed wall and connected to existing rising main.

    Drainage

    • Trench excavation to install all new pipework to cut out and tap into existing mains
    • Sump in floor of shed and connected to street.
    • Earthworks
    • Earthworks to construct new building foundations.
    • Footpath and road reinstatement
    • Landscaping around building
  • Upper Ardmore St Improvements

    Upper Ardmore St Improvements

    Project - Ardmore Roundabout and Upper Ardmore St Improvements, Wanaka
    Client -  Queenstown Lakes District Council
    Consultants / Engineer -  Name:Grant Kluyts, Company:MWH, Phone:03 450 0890

    Involvement
    New roundabout and Ardmore St business district upgrade.

    • Replace existing watermains.
    • Buildout islands for parking separation with irrigation and lighting.
    • New Roundabout
    • Footpaths, handrails , road street furniture.
    • Landscaping

  • Outlet Camp
    Project - Outlet Camp – PE pumping main with a Wastewater Wet Well 
     
    Client - Callum Urquhart
     
    EngineerName - Peter Joyce
    Company - Paterson Pitts Partners Ltd
    Phone: 03 443 0110
     
    Activities 
    • Sewer        
    • 2200 meter 100 mm dia PE rising and falling main, connecting a new WWTP at the camp ground up to the QLDC gravity main on Aubrey Road. 
     
     
  • Hawea Waste
    Project - Hawea Waste Water Treatment Plant
     
    Client - Queenstown Lakes District Council
     
    EngineerName - Helen Wightman
    Company - CPG New Zealand
    Phone: 03 477 7133
     
    Involvement
    • Design and Build system for the extractions and treatment of waste water from the storage ponds. 
    • Construct a new building structure.
    • Intake structure, pumps and pipework.
    • Electrical cabinetry, transformer, switchboards.  
    • Flow meters, Telemetry.
    • Irrigation system in adjoining land to provide irrigation for animal feed crop.
    • Commission and test new station.  
  • Hawea Bores Water Treatment
    Project - Hawea Bores Water Treatment Station
     
    Client - Queenstown Lakes District Council
     
    EngineerName - Grant Kluyts
    Company - MWH
    Phone: 03 450 0890
     
    Involvement
    • Clear site and complete earthworks for new building.
    • Construct a new building structure.
    • Install new pumps into bore wells and link bores to treatment plant with PE pipe
    • Air valves and surge protection valves. 
    • Install UV treatment and chlorine dosing equipment.
    • Electrical cabinetry, transformer, switchboards.  
    • Magnetic flow meters, Telemetry.
    • Commission and test new station. 
  • Frankton Rd  Water Pump Station
    Project - Frankton Road Water Pump Station
     
    Client - Queenstown Lakes District Council
     
    EngineerName - Grant Kluyts
    Company - MWH
    Phone: 03 450 0890
     
    Involvement
    • Clear site and complete earthworks.
    • Construct a new building structure.
    • Install 4 Grundfos CR150-5-2 pumps, stainless steel manifolds, 400 dia PE pipework, pressure test.
    • Connect to QLDC rising mains to water reservoir, new pumping main to Frankton, valves, anchor blocks.
    • Electrical cabinetry, transformer and switchboards.  
    • VSD's  4 x 55kw Danfoss drives, Magnetic flow meters, Swampfox RTU.
    • Divert existing 750mm dia stormwater at over 3m depth around site.  
    • Pavement construction
    • Commission and test new station, trail running for 1 month.
    • Demolish old pump station
     
  • Dunstan Hospital
    Project - Dunstan Hospital Waste Water Treatment Plant
     
    Client - Southern District Health Board
     
    EngineerName - David Hughes
    Company - Opus Consultants
    Phone: 03 471 5500
     
    Involvement
    • Construct new system for the treatment of waste water from the hospital. 
    • Install new underground tanks.
    • Pipework from hospital to tanks.
    • Electrical cabinetry, switchboards.  
    • Flow meters, Telemetry.
    • Trickle system pipework to allow treated waste water into ground.
    • Commission and test new station. 
    • Remove old treatment facility. 
  • Broadview Rise
    Project - Broadview Rise Water Booster Station
     
    Client - Queenstown Lakes District Council
     
    EngineerName - Grant Kluyts
    Company - MWH
    Phonn: 03 450 0890
     
    Involvement 
    • Clear site and complete earthworks.
    • Construct a new building structure.
    • Install 3 Grundfos pumps, stainless steel manifolds. 
    • Connect to QLDC rising mains, valves, anchor blocks.
    • Electrical cabinetry, transformer, switchboards and generator.  
    • Magnetic flow meters, Telemetry.
    • Commission and test new station.  
     
     
  • Outlet Camp Foul Sewer

    Outlet Camp Foul Sewer

     

    Project - New Sewer Pump Station, holding tanks and pumping main
    Client - Outlet Motor Camp
    Consultants / Engineer - Paterson Pitts Partners, Cromwell
    Involvement - Benchmark Construction was the Main Contractor, completing; 

    • Installation of over 2200m of sewer rising pumping main.
    • Wet well Pump station, Containment tank, scour and air valves, electrical switch board

  • Blenhiem St Housing New Zealand, Christchurch
    Project - Blenhiem St Housing New Zealand, Christchurch
     
    Client - Dax Group
     
    EngineerName - Brad McLeay
    Company - Dax Group
    Phone: 03 326 4055
     
    Involvement
    • New building for Housing New Zealand.
    • Siteworks.
    • On site stormwater disposal tanks.
    • All services to buildings, water foul sewer, water and connect all to CCC services.
    • Pavement construction and asphalt paving. 
    • Landscaping.  
  • Project	New World Carpark, Alexandra
    Project - New World Carpark, Alexandra
     
    Client - Breen Construction
     
    EngineerName - Craig Ross
    Company - Breen Construction
    Phone: 03 440 0190
     
    Involvement
    • Remove existing carpark and construct new carpark.
    • Mudtanks.
    • New kerbing.
    • Traffic Control and diversions.
    • Pavement construction and asphalt paving. 
    • Landscaping.  
     
  • McArthur Gardens

    McArthur Gardens

    Project - Upgrade to paving in CODC park

    Client - Central Otago District Council

    Consultant / Engineer - Central Otago District Council

    Involvement - Benchmark Construction was the Main Contractor, completing;Removal of existing asphalt paths, paving stones and irrigation. Install root guard to all gardens. Excavate and construct new asphalt footpaths and paving stones.